I think I followed the instructions in the assembly training manual for assignment 401 correctly, but I get an e-mail with apparently all the line items instead of just one line item. I think this behavior is related to the behavior that I saw in Assignment 110, where I got one emailed PDF with multiple items instead of multiple emailed PDFs each with a single item?